Date Range Page of the Reclass Wizard
Use this page to specify the range of periods or dates that you want to reclass.
Contents
Field | Description |
---|---|
Reclass all periods in the project | Select this option to reclass all data. |
Reclass all periods after the status date of the project | Select this option to reclass data only for those periods that fall after the current status date of the project. If you select this option, planned work packages with scheduled finish dates prior to the status date are not affected by the reclass. |
Reclass by a specific date range | Enter a date range that Cobra will include in the reclass process.
Click in the From and To fields to display the Date Lookup dialog boxes that contain the dates and labels in calendar set 00 of the calendar used in the project. Select the start and end dates. |
Copy baseline dates to forecast dates | Select this option to overwrite the forecast dates with the budget dates. This option is available only if:
|
Parent Topic: Reclass Wizard